TABLES AND ILLUSTRATIONS - MASTER PLAN DRAFT 2005

1. INTRODUCTION

1.1 Regional Map
1.2 Sub-Regional Map
1.3 Park Aerial Photo
1.4 Timeline
1.5 Existing Park Map

4. NATURAL ENVIRONMENT

4.1 Topography Map
4.2 Existing Vegetation Map
4.3 Natural Environment Priority Improvements Plan
4.4 Watershed Management and L.A. River Connections Plan
4.5 Headworks/LA River Section – Naturalized Condition Watershed Management Illustration

5. MOBILITY

5.1 Mobility Plan
5.2 Crystal Springs Promenade Section
5.3 Context-Sensitive Design Park Road with Center Shuttle Lane and No Parking
5.4 Context-Sensitive Design Park Road with Paved Pedestrian/Bike Path and Parallel Parking
5.5 Context-Sensitive Design Park Road with Bike Lanes and No Parking
5.6 Context-Sensitive Design Park Road with Bike Lanes, Back-In and Parallel Parking
5.7 Public Transportation and Park Shuttle Plan
5.8 Sub-Regional Mobility Systems Map
5.9 Shuttle Stop Plan
5.10 Design Standards for Pedestrian, Bicycle and Equestrian Facilities
5.11 Trail Map
5.12 Existing Parking Facilities Table
5.13 Criteria for Off-Site Parking Facilities Table
5.14 Potential Off-Site Parking Opportunities Map
5.15 Parking Management Strategies Table
5.16 Information Systems Alternatives Table

6. BUILT ENVIRONMENT

6.1 Park Areas Reference Plan
6.2 Los Feliz Pleasure Pier
6.3a River Side Reorganization Plan
6.3b River Side Improvement Plan
6.4a Park Center Reorganization Plan
6.4b Park Center Improvement Plan
6.5 Park Center Promenade
6.6a River Bend Reorganization Plan
6.6b River Bend Improvement Plan
6.7a River Valley Reorganization Plan
6.7b River Valley Improvement Plan
6.8 River Valley Gateway Plan
6.9a Toyon Vista Reorganization Plan
6.9b Toyon Vista Improvement Plan
6.10a Western Canyon Reorganization Plan
6.10b Western Canyon Improvement Plan
6.11 Overlook to Hollywood Sign
6.12a Vermont Canyon Reorganization Plan
6.12b Vermont Canyon Improvement Plan
6.13 Park-Wide Improvement Plan

7. DESIGN GUIDELINES

7.1 Park Zones Plan
7.2 Naturalized Riparian Swale
7.3 Road/Parking Area Section at Bioswale/Riparian Swale
7.4 Restoration of Trail Cut
7.5 Improved Trailhead
7.6 Storm Water Management Concept Plan: Parking Lot BMPs
7.7 Transit Shelter
7.8 Park Wide Restroom Design Standard
7.9 Information Kiosk (pedestrian)
7.10 Information Kiosk (vehicular)
7.11 Information Kiosk Plan
7.12 Pedestrian Bridge Crossing

9. ENVIRONMENTAL ISSUES

9.1 Environmental Constraints and Opportunities Map

 

** PDF Version - Tables and Illustrations Page 72 KB